Mumbai: The south-side staircase of the old footover bridge (FoB) at the south end of Andheri railway station will be closed from Jan 17. “Construction work of a 4-meter-wide skywalk from the new south-end FoB to the old south-end FoB at Andheri station, which will connect to the deck, is in progress. In connection with this, the south staircase of the old south FoB on Platform No 2 / 3 is to be dismantled,” a WR official said, adding that the staircase will remain closed for 4 months, from Jan 17 to May 16, 2023.
Trending
- Peegate: DGCA fines Air India ₹ 30 lakh for violating rules, suspends license of Pilot-In-Command of flight for 3 months
- IND vs NZ: India penalised 60% match fee for slow over-rate in the 1st ODI against New Zealand
- ‘Bahut Bakwaas Channel’: BBC gets trolled on Twitter for controversial documentary on PM Modi
- Tu Jhoothi Main Makkaar new poster out! Ranbir Kapoor, Shraddha-starrer’s trailer to release on THIS date
- NCM chairman heckled over issues concerning minorities; watch video
- 3 tips to get lower Personal Loan interest rate
- Navi Mumbai: 6 new COVID-19 cases under NMMC
- Kerala: Girls above 18 to get 60-day maternity leave at universities